52 of your 406 installs last quarter needed a second trip
Short material or dye lot was the biggest reason: 22 of the 61 return trips those installs took. Jobs with stairs needed one about 3 times as often as other jobs.
Worth acting onUp from 31 in Q2 (Q2: 31 installs)Last quarter, Jul 1 to Sep 30, 2026
A second trip is any visit to a job after its first install day that is not a warranty repair. What it cost is the crew hours times your install labor rate, plus your trip charge. The reason comes from the visit's reason code when there is one; when it is blank, our AI reads the installer note from that day. It is worth a look, not a finding about anyone.
What moved it since Q2
Last quarter (Jul 1 to Sep 30, 2026), compared with Q2 (Apr 1 to Jun 30, 2026)
Subfloor found on install day grew most: 9 more second trips than Q2 (4 to 13).
Second trips by reason, compared with Q2Before and now
Q2
Now
Show as a table
Second trips by reason, compared with Q2, before and now
Order stair carpet with the extra your measures show you need
Jobs with stairs needed a second trip about 3 times as often as other jobs last quarter.
Whoever orders material
Suggested by Oct 15
Add to my plan
Check stock and dye lot before confirming carpet install dates
22 trips last quarter came from short material or a dye lot that did not match.
Whoever orders material
Suggested by Oct 15
Add to my plan
Add a subfloor check to measures in basements and older homes
13 trips last quarter started with a subfloor found on install day.
Whoever does your measures
Suggested by Oct 31
Add to my plan
Confirm access and furniture with the customer two days before install
11 trips were for a customer or site that was not ready.
Whoever schedules installs
Suggested by Oct 15
Add to my plan
How we know this
Last quarter, Jul 1 to Sep 30, 2026
The math
Your install schedule shows 406 installs last quarter; 52 needed at least one second trip, 61 trips in all.
214.5 crew hours at your $72 install labor rate, plus your $95 trip charge on each trip: $21,239.
Reasons: 38 from reason codes and 23 from installer notes our AI read. 1 trip needs a look.
Jobs with stairs: 18 of 60 needed one (30%), against 9.8% of the others.
An install is a job whose first install day, the day of its first completed install on your install schedule, falls in the quarter. A second trip is any completed install visit to that job after its first install day, up to the end of the quarter, that is not a warranty repair. What it cost is its crew hours at your install labor rate plus your trip charge. The reason is the install visit's reason code when there is one; when it is blank our AI read the installer note written on that job that day, and any installer note it could not place needs a look. Jobs with stairs are the ones whose quote has at least one stair. The quarter before is counted the same way. The database did every calculation.
Notes our AI read
Our AI read 23 installer notes. 1 needs a look, not among the notes below.
Putting in a sold job, counted on its first install day.
Second trips
Any visit to a job after its first install day that is not a warranty repair.
Jobs
A sale you install: the flooring or window treatments, the material order and the install.
Warranty repair
A return visit to fix an install under your installation warranty.
Installer notes
Notes your installers add to a job in your flooring system.
Crew hours
Hours an install crew spent at a job, from your install schedule.
Measures
The room sizes, stairs and subfloor notes taken at a consultation.
Dye lot
A batch of carpet, plank or tile made at the same time, so its color matches.
Customer
The homeowners, property managers and businesses you sell to and install for.
Last quarter
The most recent full calendar quarter before today. On the demo date of Oct 1, 2026 that is Jul 1 to Sep 30, 2026.
Extra install cost
The crew hours on each second trip times your install labor rate, plus your trip charge for each trip, both from your install rates.
Why a second trip was needed
The reason code on the visit when there is one. When it is blank, our AI reads the installer's note for that day. Short material and a dye lot that did not match count together.
Jobs with stairs
Jobs whose quote has at least one stair. We say they needed a second trip more often only when their share is at least one and a half times the share for your other jobs.